Skip to main content

Know More about Aviation NOC

 There are certain restrictions when it comes to building an infrastructure around airport. According to Airport Authority of India (AAI) No construction is allowed within 150 meters from runways. Area between 150-500 meters is reserved for airport operation buildings. This rule is applied for any of the infrastructure that is being built near runway. It includes building, chimney, flyover, crane, bill boards, power transmission lines wind turbine, etc.




 

The requirement of the Aviation NOC certificate is very important as it is the first step towards starting out with construction of your private or commercial architecture. The Aviation NOC or in some cases called as Elevation NOC involves AAI Ministry of Defense (MOD). The job to get this certificate may seem hectic process and that’s why we are here. Foot2Feet is airport NOC consultant that assists organizations and individuals to generate Aviation NOC certificate.

Comments

Popular posts from this blog

No Objection Certificate (NOC) from Surat International Airport

  No Objection Certificate (NOC) from Surat International Airport for Height Clearance of various structures NOC from AAI  Q.1 Why No Objection Certificate (NOC) for height clearance, to proposed structure (building, mast, transmission line etc.) in and around the airport is required?  Ans - Obtaining NOC for height clearance is a statutory requirement as per Government of India’s Gazette Notifications GSR 751 (E) as amended from time. GSR 751 (E) makes it mandatory to obtain NOC for height clearance prior to start of construction. 

NOC for Height Clearance of various structures from AAI - SACS

What are standard reasons for rejection of NOC applications at verification stage?

  List of standard reasons for rejection of NOC applications at verification stage: Format of Undertaking and Site elevation & coordinate certificate is not as per AAI format. Entered site details (coordinates/elevations/any other details) in filed application does not match with the Site elevation & coordinate certificate. The Scanned copies of the attached documents is not clear/legible/opening. (upload only scanned copies of the original documents, preferably in colour). Name of the Owner and Applicant is different and Authorization part is not mentioned in the Undertaking 1A letter attached. Incomplete Undertaking (Witness Names, Address and signatures missing/ not readable/not filled all column / authorisation part not submitted / not signed / content not printed on stamp paper etc.). Incomplete Site Elevation and Coordinate certificate (Owner name & signature missing/ highest site elevation/ coordinates not upto 1/10th of second accuracy / License number and Licen...